DNP 805 Assignment Final Project Stage 5 and 6
DNP 805 Assignment Final Project Stage 5 and 6
Remember to submit your work following the file naming
convention FirstInitial.LastName_M01.docx. For example, J.Smith_M01.docx.
Remember that it is not necessary to manually type in the file extension; it
will automatically append.
Start by reading and following these instructions:
1. Quickly skim the questions or assignment below and the
assignment rubric to help you focus.
2. Read the required chapter(s) of the textbook and any
additional recommended resources. Some answers may require you to do additional
research on the Internet or in other reference sources. Choose your sources
carefully.
3. Consider the discussion and the any insights you gained
from it.
4. Create your Assignment submission and be sure to cite
your sources, use APA style as required, check your spelling.
Assignment:
Continue working on Stages 5 and 6 of KotterÂ’s Change Model
and apply to your topic.
Stage 5: Empowering
Employees for Broad Based Action
Stage 6: Generating
Short-term Wins
Discuss how the system empowers employees for broad based
actions of change as it applies to your system and how the system generate
short term wins for achievements of strategic organizational goals. This
assignment should be approximately 500-700 words in length.
Please Note: The final submission of your project is due Week
Record document delivery (Stages 5 and 6)
As-built record documents
As-built / As-installed record documents are to be delivered by the Contractor upon completion of the works. The record document package includes:
- Building fabric manual (incorporating health and safety file)
- Mechanical services Operating and Maintenance manual (O&M)
- Electrical services O&M
- Mechanical and electrical asset registers
- As-built / As-installed drawings
- Fire alarm O&M (where applicable)
- BEMS manual (where applicable)
- Specialist manuals (where applicable)
Delivery of accurate record documents is essential to enable the operation and understanding of the installation so that it can deliver performance throughout its designed life.
Quantity, format and content of record documents will have been agreed at the design Stage record document strategy meeting and in the majority of cases will fall under the standard production requirements.
Refer to:
- Record document process guidelines (pdf)
- Building fabric manual production guidelines (pdf)
- Mechanical and electrical O&Ms production guidelines (pdf)
Review of record documents
The draft documents are to be produced in accordance with the handover plan to allow for review. Refer to Record document process guidelines (pdf) for details of the review process.
Delivery
The completed, signed off record documents are to be delivered by the Project Manager upon project completion to the Archives Officer (Projects) for onward distribution to the agreed recipients. An issue memo is sent by the Archives Officer (Projects) to confirm delivery of record documents to ImperialÂ’s requirements.